International arbitration enforcement of ‘binding and final’ and ‘binding but not final’ decisions of the dispute board under the Rainbow Suite FIDIC models
DOI:
https://doi.org/10.31921/ArbitrajeRACI.n16.1a3001Keywords:
dispute board, international arbitration, FIDIC, ADR, cosntruction law disputesAbstract
The present study addresses the international arbitration enforcement of “binding and
final” and “binding but not final” dispute board decisions, in accordance with the procedures provided for in the 1999 and 2017 editions of the Rainbow Suite FIDIC models, clarifying the distinction between the binding effectiveness and the final and non-final nature of the decision. In order to overcome the doubts that still exist in this field regarding the enforcement of the dispute board decisions, the author proposes, as an optimal formula for obtaining a rapid enforcement of the aforementioned decision, the bifurcation of the arbitration proceedings by means of the petition for a partial award, requesting the enforcement of the binding but not final decision as well as the review of the underlying dispute by means of a final award.
Downloads
Global Statistics ℹ️
|
543
Views
|
366
Downloads
|
|
909
Total
|
|
References
Bailey, J., Current issues with FIDIC dispute adjudication board, Society of Construction Law, 2015.
Baker, Ellis; Mellors, Ben; Chalmers, Scott; y Lavers, Anthony, FIDIC Contracts: Law and Practice, Informa Law Routledge, 5ª Edición, 2009.
Bunni, N.G., The Gap in Sub-Clause 20.7 of the 1999 FIDIC Contracts for Major Works International Construction Law Review.
Castello, J. E. y Chahine, R., Enforcement of Interim Measures, Parte I, The Guide to Challenging and Enforcing Arbitration Awards - Third Edition, disponible en globalarbitrationreview.com/guide/the-guide-challenging-and-enforcing-arbitration-awards/3rd-edition/article/enforcement-of-interim-measures
Chern, C., Chern on Dispute Boards Practice and Procedure, fourth edition, Informa Law, 2021.
Dedezade, T. Enforcement of DAB decisions under FIDIC forms of contract, capítulo 10, en Nazzini, R. Construction Arbitration and Alternative Dispute Resolution: Theory and Practice around the World, Informa Law, Routledge, 2022. DOI: https://doi.org/10.4324/9781003155973-14
— Are ‘binding’ DAB decisions enforceable? Construction Law International, vol.6, núm. 3, 2011.
— Mind the Gap: Analysis of Cases and Principles Concerning the Ability of ICC Arbitral Tribunals to Enforce Binding DAB Decisions under the 1999 FIDIC Conditions of Contract, International Arbitration Law Review, número 4, 2012.
Draetta, U., Dispute Resolution in International Construction-Linked Contracts, Diritto del commercio internazionale: pratica internazionale e diritto, vol.24, núm. 1, 2010.
Gillion, F., Enforcement of DAB decisions under the 1999 FIDIC Conditions of Contract – a recent development: CRW Joint Operation (Indonesia) v PT Perusahaan Gas Negara (Persero) TBK, International Construction Law Review, 2011.
— The Court of Appeal decision in Persero II: Are we now clear about the steps to enforce a non-final DAB decision under FIDIC? International Construction Law Review, Volumen 4, 2016.
Gillion, F.; Morson, R.; Jackson, S. y De Jager, C. The New FIDIC Suite 2017: Significant Developments And Key Changes, International Construction Law Review 384, parte 4, 2018.
Glover, J. y Hughes, S. Understanding the FIDIC Red and Yellow Books, London Sweet & Maxwell, 2006.
Knutson, R. FIDIC: An Analysis of International Construction Contracts, Kluwer Law International, 2005.
McErlaine, M. y Allsop, J., Trends in Questions of Jurisdiction and Admissibility in International Arbitration, Kluwer Arbitration, 2021, disponible en arbitrationblog.kluwerarbitration.com/2021/11/02/trends-in-questions-of-jurisdiction-and-admissibility-in-international-arbitration/
Seppälä, C., A welcome decision from Singapore: the second Persero case, Construction International Law, Volumen 10, asunto 1, 2010.
— Enforcement by an Arbitral Tribunal of a Binding but not Final Engineer’s or DAB’s decision under the FIDIC Conditions, International Construction Law Review, 414, 2009.
— How not to interpret the FIDIC Disputes Clause: The Singapore Court of Appeal Judgment in Persero International Construction Law Review, vol. 29, parte 1, 2012.
— International Construction Contract Disputes: Second Commentary on ICC Awards Dealing Primarily with FIDIC Contracts, ICC International Court of Arbitration Bulletin, Vol. 19, núm. 2, 2008.
— Pre-Arbitral Procedure on the Settlement of Disputes under the FIDIC Conditions, International Construction Law Review, 315
— Sub-Clause 20.7 of the FIDIC Red book does not justify denying enforcement of a ‘binding’ DAB decision” Construction Law International, 6, 2011. Tweeddale, A. FIDIC’s Guidance Memorandum to users – a half-baked solution? Construction Law International, vol. 9, núm. 2, 2014
— The Courtesy Trap – FIDIC’s Sub-clause 20.5 – Amicable Settlement and Emirates trading, International Construction Law Review, 2016
Veeder, V., ‘Provisional and Conservatory Measures in Enforcing Arbitration Awards Under The New York Convention: Experience and Prospects’ 21, UN Publication Sales, núm. 99, vol. 2, 1999
Viglino, M., Can Parties to a FIDIC Contract Safely Decline Giving Effect to a Dispute Board’s Decision? The Dispute Resolution Board Foundation, Vol. 15, núm. 3, 2011
Informes
International Arbitration Survey: The Evolution of International Arbitration, elaborada por White & Case en colaboración con Queen Mary University of London, disponible en arbitration.qmul.ac.uk/media/arbitration/docs/2018-International-Arbitration-Survey---The-Evolution-of-International-Arbitration-(2).PDF
International Arbitration Survey: Adapting arbitration to a changing world, elaborada por White & Case en colaboración con Queen Mary University of London y disponible en arbitration.qmul.ac.uk/media/arbitration/docs/LON0320037-QMUL-International-Arbitration-Survey-2021_19_WEB.pdf
Global Construction Disputes Report Successfully navigating through turbulent times, Arcadis, 2021, disponible en www.arcadis.com/en-gb/ knowledge-hub/perspectives/global/global-construction-disputes-report
International Arbitration Survey – Driving Efficiency in International Construction Disputes de 2019, elaborado por Pinsent Masons en colaboración con Queen Mary University of London y disponible en www.pinsentmasons.com/thinking/special-reports/international-arbitration-survey#:~:text=Download%20report%20(49%20pages%20/%205.2%20MB)
Manual de Dispute Board: Guía de Mejores Prácticas y Procedimientos, Dispute Resolution Board Foundation (DRBF).
Modelos FIDIC
FIDIC Multilateral Development Bank (“MDB”) Harmonised Edition (2005).
FIDIC Red Book (1999) Conditions of Contract for Construction.
FIDIC Red Book (2017) Conditions of Contract for Construction.
FIDIC Red Book 4ª edición (1987).
FIDIC Silver Book (1999) Conditions of Contract for EPC/Turnkey Projects.
FIDIC Silver Book (2017) Conditions of Contract for EPC/Turnkey Projects.
FIDIC Yellow Book (1998) (“test edition”).
FIDIC Yellow Book (1999) Conditions of Contract fo Plant and Design-Build.
FIDIC Yellow Book (2017) Conditions of Contract fo Plant and Design-Build.
Sentencias
CRW Joint Operation v PT Perusahaan Gas Negara (Persero) TBK [2011] SGCA 33.
T Perusahaan Gas Negara (Persero) TBK v CRW Joint Operation (Indonesia) [2014] SGHC 146.
PT Perusahaan Gas Negara (Persero) TBK v CRW Joint Operation [2010] SGHC 202.
PT Perusahaan Gas Negara (Persero) TBK v CRW Joint Operation [2015] SGCA 30.
Laudos CCI
Laudo final CCI núm 19346
Laudo final CCI núm. 13686
Laudo final CCI núm. 16435
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Francisco Julio Dosal Gómez

This work is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.